@
Amarrahh
I'm in the same position I transfer to U on 1st Sep 2024. I got a 5th Sep appointment for a Electric Smart Meter fitted but U arrived 10 min before the 4h dead line, faft around and after 35 min said sorry no network signal. Next appointment was for 25th Sep, but U fitter did not tern up at all, next 2nd Oct fitted electric Smart Meter (2h+) but put the Inverter clamp on the wrong place of the incoming live cable so it could not kick in to stop the import of power instead of taking power from the batters for 3 days. 2 of which were sunny enough to 3/4 3/4 & fully fill my batters.
I went online to find out what was happening as IHD read when from 0w to 1.24Kw(1st time smart meter fitted) so I put the monitoring/inverter clam were it should have been. Now with out a bill in my account and on UC & EESA so I need to bugged my outgoings a bit tightly. As the U I'm with is the DD monthly, not the pre payment, should I pay some money before I have my 1st bill?